O
Seguin
← Seguin

Seguin · issues

Civic issues

Topics getting the most attention in Seguin public meetings, ranked by how frequently they come up.

21 issues (filtered)16 topics
HighRoads

Rudeloff Road Through Truck Traffic Restriction

Councilmember Lievens reported eastbound Rudeloff drivers cutting through the Greenspoint Heights neighborhood to dodge the SH 46 light, and asked for a speed-limit study on the new 30-mph stretch.

2 mentions (1 this month)Last discussed Nov 3, 2026
HighDevelopment

Tyson Foods Tax Abatement Continuity

A housekeeping letter agreement confirms Tyson Foods' internal corporate restructuring doesn't break its tax abatement agreement with Seguin — protecting an existing economic development deal.

2 mentions (1 this month)Last discussed Nov 3, 2026
HighDevelopment

ETJ Release for Karen Alden Properties

Two Guadalupe County properties owned by Karen Alden were released from Seguin's extraterritorial jurisdiction at the owner's request.

3 mentions (1 this month)Last discussed Nov 3, 2026
HighDevelopment

TSTC Future Campus Project

The board was scheduled to privately discuss the TSTC Future Campus Project, including possible incentive offers, with possible open-session action to follow. Any deal could shape technical education and job opportunities in Seguin. No outcome is on record.

2 mentions (1 this month)Last discussed Oct 27, 2026
HighGeneral

Geronimo Creek wastewater interceptor easements

The city needs utility easements along Bear Creek Trail for its 36-inch wastewater interceptor line. The council authorized condemnation as a backstop if negotiations with the property owner fail.

3 mentions (1 this month)Last discussed Oct 20, 2026
HighWater Utilities

Water treatment plant expansion and reliability

A new 94-foot clarifier adds redundant treatment capacity and replaces pumps at the end of their life, positioning the city for a future water plant replacement. It's a $19.5 million investment funded through certificates of obligation.

1 mention (1 this month)Last discussed Oct 20, 2026
HighWater Utilities

Walnut Branch sewer and water main replacement

The city's aging 24-to-30-inch sewer main running through downtown and across Court Street is getting a $4.4 million rehab. Critical infrastructure in sensitive parts of town.

1 mention (1 this month)Last discussed Oct 20, 2026
HighTransportation

Cordoba Road widening project timeline

A roughly $40 million federally funded road widening that must reach construction by September 2027 to keep its funding. The council approved a $214,713 construction management contract to keep utility relocations and construction from colliding.

3 mentions (1 this month)Last discussed Oct 20, 2026
HighWater Utilities

Willmann Road flooding and subdivision drainage

Neighbors along the dead-end stretch of Willmann Road say the area already floods regularly and a low-water crossing strands families after modest rain. The developer's plan routes subdivision runoff through a drainage ditch to Geronimo Creek, and a flood study is still under engineering review.

1 mention (1 this month)Last discussed Oct 13, 2026
HighDevelopment

Standalone parking lot at 601 East Gonzales

A small commercial lot at the corner of San Marcos and East Gonzales will become a six-space parking lot to support an office being opened in the house next door. The lot must stay linked to that office even if the property changes hands.

5 mentions (1 this month)Last discussed Oct 13, 2026
HighDevelopment

The Nolte Project Downtown Redevelopment

The city signed a milestone-based development agreement with GFNT-Seguin, LLC to redevelop the city-owned block downtown, with firm deadlines for designs, financial models, and a purchase agreement — and clear exit ramps if the numbers don't work. Parking remains the big open question.

3 mentions (1 this month)Last discussed Oct 5, 2026
HighSchools

Seguin ISD Proposition A (VATRE)

The school district is asking voters to shift two golden pennies, keeping the total tax rate at $1.828 while unlocking about $2.5 million a year for teacher recruitment, operations, and campus safety. Early voting runs October 19–30; election day is November 3.

1 mention (1 this month)Last discussed Oct 5, 2026
HighPublic Safety

Fire Station #4 construction

The ~$10 million fire station is through design basics, with a construction manager selection nearly done, construction starting around April 2027 and completion in fall 2028.

2 mentions (1 this month)Last discussed Oct 5, 2026
HighRoads

Transportation Mobility Master Plan / Thoroughfare Plan adoption

Seguin is replacing its 2017 thoroughfare plan with the road portion of a new multimodal mobility plan. It guides where future roads go as the city grows, so developers must dedicate right-of-way and build their share — the city isn't planning to construct these roads itself. The trails portion is still being finished and will come back later.

2 mentions (1 this month)Last discussed Oct 5, 2026
HighRoads

FM 78/Ruloff Road intersection safety

A longtime resident's email, read by Council Member Lievens, warns of increasing collisions at the FM 78 and Highway 1620/Ruloff intersection and calls for a four-way signal, with growing traffic expected from the NewQuest development.

1 mentionLast discussed Sep 15, 2026
HighRoads

Martindale-Strempel roadway improvements

Council awarded a $4.24 million construction contract — 30% under estimate — to fix the confusing dual-road arrangement, with about nine months of construction and a possible new signal at Strempel and SH 123.

1 mentionLast discussed Sep 1, 2026
HighParks Rec

New community park north of IH-10

The City hired RVi for $587,640 to design a long-sought big park on the north side with a splash pad, pavilions and practice fields, sharing parking with the new Fire Station #4.

1 mentionLast discussed Sep 1, 2026
HighGeneral

Roof Replacements at City Facilities

Three aging city roofs — the Coliseum gazebo, Parks Office, and Water Plant — will be replaced, fixing leaks and dangerously soft decking.

2 mentionsLast discussed Jun 16, 2026
HighPublic Safety

Riverside Pride Event at the Seguin Events Complex

The October 2026 Pride booking at the Coliseum drew more than two hours of public testimony split between supporters and opponents. The city attorney explained the lease was executed by staff under content-neutral rules, that available information indicates no SB 12 violation, and that the council has no scheduled vote on the matter.

42 mentionsLast discussed Jun 16, 2026
HighWater Utilities

84-Inch Storm Sewer Pipe Rehabilitation

The giant storm pipe running under the hospital area has failed three times and was the same pipe that broke near the Gbra outfall last July 5th. The $527,000 trenchless repair seals 26 failing joints and avoids a replacement project that could cost tens of millions.

1 mentionLast discussed Jun 16, 2026
HighGeneral

Public Facility Corporation Leadership Change

Rick Cortes resigned as the PFC's Executive Director and Assistant City Manager Tim Howe took over the role.

1 mentionLast discussed Jun 16, 2026